USD 92.5919

+0.02

EUR 100.2704

-0.14

Brent 86.8

+1.11

Natural gas 1.746

+0.03

Ratings

Rating Categories
Position Hits
61

Tyra is Denmark’s largest natural gas field and has been a center for processing and exporting more than 90% of the natural gas produced in the Da...

102
62

Oil production in Kazakhstan increased by 14 % over the year with daily production reaching 1.7 billion barrels of oil, according to the latest re...

102
63

In 2019, Bulgartransgaz signed a €1.1 billion contract with Saudi-led consortium Arkad for the construction of a gas pipeline, which will connect the ...

102
64

This is a significant step toward achieving First Production from the Sangomar field which is targeted for mid-2024.

101
65

TotalEnergies is the operator of PML2 with a 24% interest, in partnership with CNOOC (45%), Sapetro (15%), Prime 130 (...

101
66

2nd line would only be available from 2028

101
67

UK-based Avenir LNG has completed its first liquefied natural gas (LNG) delivery into the newly commissioned Hamina LNG terminal in Finland.

100
68

Every industrial enterprise at a certain stage faces the need for optimization. Everyone implements it in their own way. However, the goal of these ac...

100
69

The closing of the transaction is subject to the satisfaction of certain conditions including all regulatory and contractual approvals.

98
70

Russian producer Novatek’s planned ammonia-hydrogen complex will allow it to replicate its success in LNG and get an early foothold on the blue ammoni...

98
71

Baku, June 4 - Neftegaz.RU. The total volume of BP's capital expenditure on Azerbaijan's oil & gas projects between 1995 and 2019 amounted to $75 ...

98
72

The vessel will be moored at the jetty of the LNG terminal and be used to receive, store, and regasify LNG before it is supplied to CLP Power’s Black ...

97
73

In the context of the energy crisis in Europe, nuclear power plays a particularly important role in ensuring energy security and sustainable energy su...

94
74

Proceeds from this transaction will be put towards general corporate purposes.

93
75

Russia says $80 oil adequately reflects market situation

93
76

The 878 km pipeline connects with TANAP at the Turkish-Greek border, crosses Greece and Albania and the Adriatic Sea, before coming ashore in Southern...

93
77

In 2008, Gazprom won a hydrocarbon exploration and development bid, receiving a 49% stake in the joint project

92
78

Nur-Sultan, November 22 - Neftegaz.RU. Kazakhstan Prime Minister Askar Mamin attended a capsule laying ceremony at the construction site of a methano...

92
79

The company’s assets are all located in the Pre-Caspian Basin close to the Russian border and in close proximity to some of the most significant hydro...

91
80

The Lithuanian gas market Get Baltic, which is launching operations in Latvia and Estonia in July, projects growth.

91