USD 92.5058

-0.79

EUR 98.9118

-0.65

Brent 89.25

+1.21

Natural gas 1.972

0

2451

Ilham Aliyev: First gas and oil at Karabakh field should be produced in 2 years – at the end of 2022

Ilham Aliyev: First gas and oil at Karabakh field should be produced in 2 years – at the end of 2022

Baku, August 11 - Neftegaz.RU. First gas and oil at Karabakh field should be produced in two years – at the end of 2022, Azerbaijani President Ilham Aliyev said in an interview to Azerbaijan Television following a ceremony at Baku Deep Water Jackets Plant named after Heydar Aliyev to send a jacket of Karabakh field offshore, Trend reports.

“The oil potential of the Karabakh field is estimated at 60 million tons but I am absolutely sure that this figure will increase at the stage of development. This is indicated by the fact that the Karabakh field is located in the vicinity of Azeri, Chirag and Gunashli fields. The distance is not very large. I remember that when a contract was being drafted for the Azeri, Chirag and Gunashli fields in 1994, foreign partners estimated the potential of these fields at 511 million tons of oil", Aliyev said.

"However, life has shown – and this has now been confirmed – that the potential of the Azeri, Chirag and Gunashli fields exceeds 1 billion tons of oil. Therefore, this and other geological factors provide sufficient ground to believe that the volume of natural resources in the Karabakh field is higher. As for production, this field will annually produce at least 1.5 million tons of oil and 1.5-1.8 billion cubic meters of gas. Of course, this will be of great benefit to maintaining the stability of oil production and increasing gas production in Azerbaijan,” the Head of state said.

Follow us on Google News
Advertising at neftegaz.ru

Subscribe to our newsletter

of the best materials Neftegaz.RU

* Incorrect E-Mail Address

By clicking the "Subscribe" button I accept the "Agreement on the processing of personal data"


Advertising at neftegaz.ru