USD 94.0922

-0.23

EUR 100.5316

+0.25

Brent 87.39

+0.54

Natural gas 1.797

+0.06

2169

Gazprom Neft produces its 12-millionth tonne of oil at its Prirazlomnoye field

Gazprom Neft produces its 12-millionth tonne of oil at its Prirazlomnoye field

St.Petersburg, December 26 - Neftegaz.RU. The 12-millionth tonne of ARCO (Arctic-blend) oil has now been produced and shipped from Gazprom Neft’s Prirazlomnaya offshore platform, delivered by the Kirill Lavrov ice-class shuttle tanker to the Kola Bay, where the Umba storage tanker is harboured, and from where it will be shipped, in standard batches, to Europe.

The Prirazlomnoye field is the first — and, thus far, the only — project at which oil is being produced on the Russian Arctic Shelf. Commercial development of this field has seen 18 wells drilled, with construction of the 19th due for completion in the immediate future.

Safe year-round oil shipments from the Prirazlomnoye field, and effective logistical project support in the freezing Barents Sea, are ensured through the ice management system the company has in place here — a further key element of which will be the Ice Situation Management Centre currently being put in place. Using specially developed software, this centre will receive and analyse data generated from regional and local monitoring of hydro-meteorological and ice conditions.

The use of self-learning mathematical models will facilitate the development of more accurate weather forecasts of weather shipping opportunities (shipping windows) and make it possible to identify potentially dangerous ice formations at an early stage. All information received and processed, together with online expert recommendations, will be available to captains responsible for managing the platform, tankers and support-vessels.

«Prirazlomnoye is in active development. We are continuing to increase well stock at this field, and increasing cumulative oil production volumes. The cutting-edge technologies deployed by the company, together with unique logistical solutions, are making it possible to drill wells all year round, and to produce oil and ship it, even in the most challenging ice conditions. With more than five years under continuous production the Prirazlomnoye field is demonstrating the considerable potential of further offshore projects in the Arctic», said Sergei Chigay Acting CEO, Gazprom Neft Shelf.

Follow us on Google News
Advertising at neftegaz.ru

Subscribe to our newsletter

of the best materials Neftegaz.RU

* Incorrect E-Mail Address

By clicking the "Subscribe" button I accept the "Agreement on the processing of personal data"


Advertising at neftegaz.ru