USD 92.1314

-0.37

EUR 98.7079

-0.2

Brent 89.41

+0.16

Natural gas 1.932

-0.04

734

SIBUR’s First Custom-Built Gas Carrier, Sibur Voronezh, Arrives at Ust-Luga

Ust-Luga, 9 September 2013. SIBUR announces the arrival of its first new gas carrier, Sibur Voronezh, at Ust-Luga seaport. The vessel will ship cooled liquefied petroleum gas (LPG) from the company's Baltic Sea terminal on a regular and year-round basis.

SIBUR’s First Custom-Built Gas Carrier, Sibur Voronezh, Arrives at Ust-Luga

Ust-Luga, 9 September 2013. SIBUR announces the arrival of its first new gas carrier, Sibur Voronezh, at Ust-Luga seaport. The vessel will ship cooled liquefied petroleum gas (LPG) from the company's Baltic Sea terminal on a regular and year-round basis.

SIBUR will operate the carrier under a long-term charter agreement with Sovcomflot Group. The carrier was built by Korea-based Hyundai Mipo Dockyard Co. Ltd. The ship has already covered 12,000 nautical miles in 40 days on its journey from the Korean shipyard, where it set-off for Ust-Luga in late July.

The gas carrier is moored for test loading at SIBUR's new terminal as part of its start-up and commissioning programme. Once loading in Ust-Luga seaport has been completed, the carrier will head for Sweden on an LPG delivery.

A naming ceremony for Sibur Voronezh and SIBUR’s other new LPG carrier, Sibur Tobol, took place at Hyundai Mipo Dockyard’s shipyard on 4 July 2013. The gas carriers were named after the Russian Voronezh and Tobol rivers which flow through regions where SIBUR has its operations. Sibur Tobol, is expected to arrive at Ust-Luga in November 2013.

Both gas carriers were designed to SIBUR's specific requirements using the latest shipbuilding technology and in partnership with experts from Sovcomflot Group.

The ships are designed with ballast water treatment systems which will be compulsory for all vessels from the end of 2013. Their reinforced hulls will enable them to operate in harsh North Atlantic conditions with an active service life of 25 years. Operating in normal climatic conditions the ships would last even longer. Both ships are of 1B ice class (Ice3 in the Russian Maritime Register of Shipping), which will allow them to operate effectively in low Baltic Sea temperatures during their winter passages.

The vessels are fitted with navigation instruments and software from Russian manufacturers.

Technical specifications of the vessels:

Overall length – 159 m
Breadth – 25.60 m
Depth – 16.40 m
Moulded draught – 10.90 m
DWT – 22,760 tonnes
Main engine output – 7,780 kW


Follow us on Facebook
Advertising at neftegaz.ru

Subscribe to our newsletter

of the best materials Neftegaz.RU

* Incorrect E-Mail Address

By clicking the "Subscribe" button I accept the "Agreement on the processing of personal data"


Advertising at neftegaz.ru